Aglorify · Site Scan · Demo

See it before it's built.

Place a proposed data center on real laser-scanned terrain and watch what happens to the land and water, before anyone breaks ground.

01 · The problem

At a hearing, people may only see a site plan.

A flat drawing shows a footprint. It doesn't show the hills, the creeks, or where the rain goes once the forest becomes roofs and pavement. Aglorify puts the proposal back on the real land.

Two views of the same site: a flat site plan with a footprint, and the real terrain with contours and the path runoff would take from the footprint

02 · One site, four stages

The land today

71% forest, 24% pasture. Rain soaks into leaves, roots and loose soil, and reaches the creek slowly.

49–87
CFS · PEAK RUNOFF · 25-YEAR STORM

03 · From laser points to water

Every square sends its water downhill.

Public USGS LiDAR becomes a 150 × 150 grid a browser can read. False pits are filled, each square drains to its steepest neighbor, and where enough land drains together, a channel appears. Nobody draws the creeks; they come from the terrain.

The example terrain as dense laser points resolving into a grid of elevation squares
LIDAR → GRID
The drainage network computed from the terrain: thin threads gathering into teal channels
DRAINAGE
150 × 150

Elevation grid, about 16 × 19 m per square on the example site

25 ha

Land draining to one point before the model marks a channel

+3%

Drainage area vs USGS at one point: 0.48 vs 0.47 sq mi

04 · Before and after

Two methods, one honest range.

The Rational Method and NRCS TR-55 are shown side by side as a range, never a single number that looks more certain than it is. NOAA Atlas 14 sets the storms; real land cover sets how much rain soaks in.

Split-screen view of the site in 3D: before development on the left, the operating data center on the right BEFOREAFTER
2.9
ACRE-FEET OF DETENTION

Estimated storage needed to hold the 25-year peak at today's level on the example site. An early planning estimate, not an engineering design.

15 of 16

05 · Checking our work

Inside the USGS range, with nothing tuned to match.

At two points on the creek, 15 of 16 runoff estimates fell inside the USGS StreamStats 90% prediction range. The one miss, a Rational Method 2-year peak that ran high, stays on the page.

A proposed footprint on real terrain with numbered markers for the footprint, a zoning boundary, the setback and a protected stream buffer

06 · The rules on top

The four questions before a vote.

  1. Is a data center allowed under the site's current zoning?
  2. If not, does it need a rezoning or special-use permit?
  3. Does it meet the zone's rules, or need a variance?
  4. Is it in an overlay, like a protected watershed?

Live Forsyth County zoning, parcels and stream buffers, with a what-if under Cobb County's new data center ordinance.

07 · Try it

The real tool, right here.

Move the data center, step through the stages, trace the watershed, and print a staff memo. Or upload your own elevation file from anywhere in the U.S.

aglorify-site-scan.vercel.app

Free · runs in any browser

Better planning starts with better information.